• We communicate with you as to the time of arrival  to put up the dogs up or move cars
  • Remove the old shingles down to the decking
  • Place trailer on drive-way and walk shingles to front of roof and throw in trailer
  • Check for any rotten wood, replace FOR FREE if found rotten
  • Remove the old nails from roof
  • Remove the old valley metal
  • Replace valley metal with NEW upgraded GAF stormguard in valley (self sealing the nails)
  • Replace the underlayment felt or rhino roof underlayment (extra charges may apply for rhino roof underlayment)
  • Add GAF pro-starter strip to the eaves and gables (to prevent blow off)
  • Start at bottom and shingle up to the ridge 
  • ​Install with 6 nails per shingle for extra wind protection (The manufacturer only requires 4, Roof 1 does 6)
  • ​Replace all pipe jacks with brand new
  • Add cobra ridge vents to remove hot trapped air in attic (lower attic temps by 10-15 degrees, extra charges may apply)
  • Seal and caulk all  exposed nails and Roof Penetration
  • Paint all roofing heater stacks, pipe jack to match roof color.
  • Clean entire yard for all nails and trash (use a rolling magnet for the yard and hand magnet for flower beds)
  • MAKE SURE ALL NAILS ARE PICKED UP FOR THOSE LITTLE KIDS (we get 95% of nails but sometimes in the down spouts after a rain you will find a few at the outlet of the gutter)

 THE  CORRECT WAY TO BUILD A NEW ROOF ​  ​By ROOF 1 CONSTRUCTION

Copyright  ©  ROOF 1 CONSTRUCTION    Privacy Policy

ENJOY YOUR NEW ROOF FOR MANY MANY YEARS WORRY FREE

Roof 1 Construction

Roof Hail Damage

Reroof

​​​​​​​​

1-855-ROO​F-1-FAST

​​CLICK THE RED LINKS FOR VIDEOS EXAMPLES